Acting Deputy Minister of Infrastructure, Hysen Durmishi, has shared photos of the ongoing construction of the bridge over the Iber River.
In a Facebook post, he stated that only the concreting of the slab and the asphalt layer remain to be completed.
Durmishi confirmed that the bridge will be ready for both vehicle and pedestrian traffic by September.
