The Kosovo Energy Corporation (KEK) has announced that Unit A5 has resumed operations during the early hours of today.
According to KEK, the unit was restored following the successful repair of leakages that had been reported in recent days. The corporation confirmed that all technical and safety requirements were fully met before the unit was brought back online, ensuring the continuation of stable and regular operations.
KEK also emphasized that the Kosova A Thermal Power Plant is currently operating with three active generating units, contributing to the stable production and supply of electricity in the country.
